Description
Equipment installation
The equipment single-phase 220V power supply, suggests using 2.5 mm2 cable wiring, airframe to grounding. The equipment adopts a pneumatic drive, gas supply pressure 0.6-0.8 Mpa, flow does not less than 1m3 / min, and clean, dry air pressure requires small ripple. The machine needs to put on smooth and solid ground, the installation environment request ventilated, dry, far from flammable objects. Avoid installing in more dust, moisture, and vibration environment. Main component: PLC: “MITSUISHI” Japan.
PRODUCT SPECIFICATIONS
Model
|
RLS-A300~900
|
Forming Dimensions.
|
≤250~900mm for the lampshade
|
Forming Height
|
≤200mm
|
Forming Thickness
|
1-3.5mm
|
Power supply
|
380VAC/3phase/50HZ
|
Upper mold
|
Hydraulic pressure + Hinge
|
Air pressure
|
0.5-0.8Mpa
|
Suggest air compressor
|
10~15HP
|
PLC
|
“Mitsubishi” Japan
|
Touch screen
|
“WeinView” Taiwan
|
Safety device
|
Safety curtain
|
Material moving
|
Servo motor
|
Switch
|
“DELIXI” or “CHNT” China
|
Air Cylinder
|
“Zhicheng” China or “Airtac” Taiwan
|
Electromagnetic Valve
|
“Airtac” Taiwan
|
Consumption
|
30KW
|
Machine size(L×W×H)
|
2400*1600*2200mm
|
Machine weight
|
About 2500KG
|
PRODUCT CONFIGURATION

CHANGCHAI high power engine

Imported EATON control valve

Japan Shimadzu hydraulic motor
Successful Project

Project in Thailand

Project in India

Project in Russia
from ROMAS LIGHTING (Jessica: +86 13640669893 Wechat/WhatsApp)






